Scope · Istanbul and Bodrum

Right down to hanging the curtains

Most firms say “turnkey” and then leave you with the furniture, the curtains, the garden and the installations. We don’t. The list below is everything we take on in a project — and we do all of it with our own design staff, our own site team and our own pool of trades.

Garden and poolLandscaping, irrigation, exterior lightingFurniture and textilesSelection, ordering, installation, curtainsFitted furnitureKitchen, fitted wardrobes, joineryWaterrfaces and lightPaint, flooring, cladding, lightingPlumbing and electricsWater, heating, distribution board, smart-home wiringStructureWalls, screed, waterproofing, façade

If something isn’t on it, tell us — usually it is.

Our team

The team that builds it is our own

We are not a middleman who wins the job and hands it on. Our own staff design it, our own pool of trades build it, and our own project manager runs the site.

YOUANCORAANCORA TEAM AND POOLArchitectElectricianPlumberCarpenterFurniture supplierGardener
  • We never outsource design. Our architects and interior architects are on our own staff. The drawing, the 3D visual and the construction detail all come from the same team, so nothing gets lost between the drawing and the site.
  • The pool is closed. In every trade we work with teams we have used for years — insured and certified. We don’t chase the cheapest bid on every job and put strangers into your home.
  • We buy direct from suppliers. We hold agreements with manufacturers and suppliers for materials, furniture, appliances and joinery. With the middleman removed, both price and lead time stay under our control.
  • Waterpervision stays with us. We don’t leave the site to the subcontractor’s own supervision; the project manager and site foreman are on our payroll.
What we do bring in from outsideOnly the work that has to be independent by law: structural design, statutory building inspection and the soil survey. Where something calls for separate expertise — specialist restoration, for instance — we bring in an outside expert, and we tell you when we do.

Why the list is long

Every item carries two pieces of information

How long it takes, and the latest point at which you can decide. The second one matters: choose the kitchen three weeks late and the paint and the flooring have to be done again.

01

Structural works

  • Removing and building walls
  • Taking out non-loadbearing partitions
  • Structural strengthening
  • Floor preparation and screed
  • Waterproofing in wet rooms
  • Terrace and roof waterproofing
  • Façade and external insulation
  • Roof repair and re-tiling
  • Rubble removal and licensed waste disposal
Worth notingIn Bodrum there is one more heading: detailing that stands up to sea air. An ordinary balustrade or window frame is finished within three years in a house near the coast.
02

Plumbing, heating, electrics

  • Renewing the fresh-water and waste pipework
  • Water filtration and pressure system
  • Combi boiler
  • Underfloor heating
  • Radiators
  • Towel radiator
  • Heat pump
  • Air conditioning and ducted systems
  • Kitchen and bathroom ventilation
  • Renewing the distribution board and the wiring
  • Socket and switch layout
  • Earthing
  • Internet
  • Television
  • Intercom
  • Camera and alarm wiring
  • Smart-home system
  • Roof solar panels and an EV charging point
Worth notingThe smart-home decision has to be made in the design stage at the latest. The wiring goes inside the wall; once the wall is closed there is no going back.
03

Lighting

Lighting is a heading of its own with us, because it does more than anything else to decide how a house looks — and it is the thing most often skipped.

  • Planning how much light, and what colour of light, each room gets
  • Recessed downlights
  • Concealed cove lighting
  • Under-worktop lighting
  • In-cupboard lighting
  • Stair lighting
  • Chandeliers
  • Pendants
  • Wall lights and table lamps
  • Garden
  • Pool and façade lighting
  • Dimming and scene control
Worth notingLead times on imported fittings can run to 6–12 weeks. That is why the selection is locked at the end of the design stage.
04

Interior architecture and finishes

  • Room layout and space planning
  • 3D visuals
  • Material and colour palette
  • Room-by-room material schedule
  • Plaster and satin skim
  • Paint
  • Decorative plaster
  • Wallpaper
  • Timber and stone cladding
  • Waterspended ceilings
  • Ceramic and porcelain tile
  • Natural stone and marble
  • Solid and engineered wood flooring
  • Laminate
  • Vinyl
  • Bathroom (sanitaryware, taps, shower enclosure, bath, vanity, mirror)
  • Kitchen (units, worktop, sink, splashback, internal fittings)
  • Windows
  • Security entrance door
  • Internal doors
  • Sliding systems
  • Glass partitions
  • Shutters and insect screens
05

Carpentry and fitted furniture

This group does more than any other to set how the house feels — and it also causes the most delay.

  • Fitted wardrobes and walk-in closets (internal fittings, lit shelving, drawer runners)
  • Hallway storage
  • Pantry
  • Laundry room
  • Media unit
  • Bookcases
  • Desks
  • Window seats
  • Bed bases and headboards
  • Bedroom wall panelling
  • Stairs and balustrades
  • Door linings
  • Architraves
  • Skirting
  • Concealed curtain recesses
  • Exterior timber
  • Decking
  • Pergolas
  • Shade structures
Worth notingThe joinery contractor is locked in during the design stage; measurements are taken once the shell work is finished, production runs 3–6 weeks, and installation happens before painting. If that order slips, the paint and the flooring get done twice.
06

Furniture, appliances, curtains

  • Seating
  • Dining table and chairs
  • Beds
  • Accessories
  • Rugs
  • Pictures and mirrors
  • Oven
  • Hob
  • Extractor hood
  • Dishwasher
  • Fridge
  • Washer and dryer
  • Built-in appliance solutions
  • Made-to-measure curtains and blinds
  • Watern blinds
  • Blackout curtains
  • Sheers
  • Motorised curtain systems
  • Pelmets and concealed tracks
  • Styling and setting the house up before handover
  • Professional photography
Worth notingWe have a separate package for short-term lets: hard-wearing materials, a multi-bed layout and a “ready to live in” handover that includes the crockery and cutlery.

Lead times on imported furniture and motorised curtains run to 8–16 weeks. The handover date is usually set by these items, not by the building work.

07

Garden and pool

  • Garden design and plant selection
  • Excavation
  • Drainage
  • Retaining walls and levelling
  • Automatic drip and sprinkler system
  • Timed control unit
  • Moisture sensor
  • Water tank and booster pump
  • Lawn or artificial grass
  • Trees and shrubs
  • Planter arrangements
  • Protecting the existing olive trees
  • Stone and timber paving
  • Paths
  • Parking
  • Fences and walls
  • Automatic garden gate
  • Outdoor furniture
  • Barbecue and outdoor kitchen
  • Gazebo
  • Pool and hot tub (excavation, reinforced concrete, waterproofing, finishes, filter and pump, heating, automation, child safety)
  • Garden and pool lighting
Worth notingPlant selection in Bodrum is a job of its own: unless you choose plants that suit the local climate and need little water, the garden is spent within two summers.
08

Permits, handover and afterwards

  • Council permission or a building licence
  • Approval from the building management and the owners’ association
  • Application to the conservation board (where required)
  • Fire brigade and fire-safety approval (for commercial spaces)
  • The permit file for short-term letting
  • Electrics
  • Water
  • Gas connections
  • Internet infrastructure
  • Lift compliance
  • Final clean
  • Moving in and setting up
  • Closing out the snag list
  • Handing over warranty documents and manuals
  • Training on how to use the systems
  • 12–24 months of warranty follow-up and an annual maintenance package (pool, garden, irrigation, air conditioning, boiler)

Limits

What falls outside the scope

We write down what we don’t do as well. If we can’t do a job, we say so — we don’t learn on your project.

Work we don’t take on

To be straight about it, there is work we don’t take on:

  • Statutory building inspection and technical liability. That is the legal responsibility of the building inspection body and the site manager. We run the process; we don’t carry the legal liability.
  • Structural calculations and strengthening design. That is the job of the engineer of record. We procure it and we check it.
  • Bank loan paperwork. The process stays with you; we only produce the progress-payment report the bank asks for.

What does your list look like?

On the survey we walk the property and work out together which items you need. Free, and with no commitment.